Hi There,
I am looking to migrate to VC5 from 4.1. What I would like to do is do a fresh install of VC and the DB to keep things neat and tidy, but i'm stuck being unable to move the hosts connected to the distributed switch.
Does anyone have any experience attempting this? I don't want to migrate all 600 VM's back to standard vswitches before moving them to the new VC. Is there any other way?
Thanks,
Matt